奇米线在人线免费视频-奇米网在线视频-奇米网在线观看-奇米网色-奇米网奇米色-奇米网狠狠干

上海金泰工程機械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

主站蜘蛛池模板: 国产精品国产福利国产秒拍 | 欧美四虎| 欧美va| 视频国产免费 | 得得啪在线 | α级毛片| 一级欧美一级日韩 | 久久精品一区二区国产 | 精品特级一级毛片免费观看 | 一区二区三区四区视频在线观看 | 韩国 欧美 日产 国产精品 | 国产精品视频白浆免费视频 | 日韩精品久久不卡中文字幕 | 久久国产成人福利播放 | 亚洲欧美视频在线观看 | 欧美成人观看视频在线 | 爱爱免费视屏 | 在线免费观看视频你懂的 | 欧美成人免费全网站大片 | 天天天天天天干 | 国产深夜| 成人免费网站在线观看 | 国产图片综合 | 亚州αv| 午夜影院在线免费观看 | 人人干人人模 | 亚洲图欧美日韩色综合图 | 欧美黄三级在线观看 | 全部在线播放免费毛片 | 国产性大片免费播放网站 | 深夜福利视频在线看免费 | 欧美日韩一区二区视频免费看 | 国产亚洲区 | 在线不卡一区二区 | 最近2019免费高清在线视频观看 | 国产女人好爽好多水 | 久久aa毛片免费播放嗯啊 | 成人欧美一区二区三区视频xxx | 欧美激情艳三级 | 欧美一区二区三区不卡 | 亚洲国产日韩综合久久精品 |